The situation

Production output was reported into the ERP system manually at the end of each shift. Planning worked from figures that were a day old, stock accuracy drifted, and quality traceability depended on paper records held at each site.

What we did

  1. 01

    Modelled the data flow between plant systems, the ERP, and the quality function

  2. 02

    Built an event driven integration layer with idempotent processing and dead letter handling

  3. 03

    Delivered reconciliation reporting so finance could verify production figures tie out

  4. 04

    Digitised quality traceability records with lineage at batch level

  5. 05

    Handed over with runbooks, monitoring dashboards, and training for the internal IT team

The outcome

  • Real time

    Production reporting into planning, previously end of shift

  • 98.6%

    Stock record accuracy, up from an estimated 89%

  • 2 sites

    Brought onto a single traceability record

Next step

Let's establish whether we are the right firm for the problem.

Tell us what you are trying to achieve and we will tell you plainly whether we can help, what it would take, and roughly what it would cost. If the answer is that you do not need us, we will say so.

What to expect

  • Initial consultation at no cost
  • Mutual NDA signed before discovery
  • Written findings you own outright

Enquiries are answered by a consultant, not a call centre. We typically respond within one business day.